Pumps & Valves

Tsurumi equipment support for high-pressure mine operations

Dewatering and submersible pump programs built for slurry, seepage, and continuous mine drainage. The program focuses on documented selection, faster commissioning, and spare-parts planning that keeps crews aligned from first quote to scheduled overhaul.

Tsurumi mining equipment in operation
Operating Method

A concise workflow for submersible pump systems for pit and tunnel dewatering

01

Application review

Operating data is checked before a model, kit, or system is quoted.

02

Uptime planning

Critical spares and changeout steps are identified while the order is still being specified.

03

Field-ready packaging

Each shipment can be organized by installation phase, equipment tag, or shutdown window.

04

Lifecycle support

Replacement parts, rebuild guidance, and operating feedback stay connected after delivery.

05

Clear commercial scope

Options, exclusions, and recommended alternates are documented in plain language.

06

Practical safety focus

Guarding, isolation, lifting, and access requirements are considered early.

Product Lines

Core equipment families for Tsurumi

Submersible dewatering pumps

Submersible dewatering pumps

Configured for pumps & valves requirements with attention to uptime, site handling, and spare-parts continuity.

Slurry pumps

Slurry pumps

Configured for pumps & valves requirements with attention to uptime, site handling, and spare-parts continuity.

Mine pump controls

Mine pump controls

Configured for pumps & valves requirements with attention to uptime, site handling, and spare-parts continuity.

Pump wear kits

Pump wear kits

Configured for pumps & valves requirements with attention to uptime, site handling, and spare-parts continuity.

Specification Control

Selection data that keeps Tsurumi projects measurable

Each request is translated into duty, feed, wear, hydraulic, power, and maintenance assumptions before equipment is proposed.

Duty EnvelopeOre, slurry, or drilling conditions mapped to operating hours and expected load.
Maintenance AccessService points reviewed for shutdown duration, tooling, and personnel exposure.
Wear StrategyConsumable intervals planned around abrasiveness, impact, solids, and inventory policy.
DocumentationSubmittals, drawings, manuals, and commissioning notes packaged for site teams.
4Inquiry review stages
3Spare priority levels
1Named project contact
0Guesswork in final scope
Project Support

Send your Tsurumi equipment requirement

Share the operating conditions, replacement target, or equipment tag. The response can separate immediate options from engineered recommendations.